Project Overview
Development Design Associates and Bradshaw Gas and Hope designed the Scheme to extend the Existing Mary Kelly Building to create additional Classrooms and extended Library.
All works was carried out whilst the College was fully operational. Careful consideration was taken between Performance Electrical, H.H.Smith & Sons and the College to ensure the Building could be fully operational during the 24 Week Programme.
Electrical services included LV Distribution/Containment/General and Emergency Lighting/Small Power/Fire Alarms/Intruder Alarms/CCTV/Door Access/Voice and Data Cabling/Induction Loops and Emergency Voice Alarms.